Customer Challenge
Our customer had a substantial amount of runner waste. In addition, while side actions were deemed necessary, they were a limiting factor when attempting to up-cavitate.
The Solution
By keeping up with the latest mold-building developments, our ESI team was able to direct-gate the part. And by challenging the status quo, we discovered multiple options to keep the parts the same but eliminate the need for actions.
The Result
The customer increased its margins dramatically by eliminating runner waste, and doubled its capacity by removing the need for actions.